Residential Applications
Selected projects carried out
A TEON heat pump with a thermal power of 82 kW was installed in a class B an apartment building built in the mid-1980s in the western outskirts of Milan. The heat pump replaced a methane-fueled condensing boiler, for the production of heating in the winter season and DHW throughout the year. The intervention was carried out without modifying the existing system, consisting of radiators, and involved the construction of a well for the extraction of groundwater. In the power station, a thermal accumulation has been inserted to allow greater availability of domestic water compared to the previous situation, resulting in the elimination of the methane line. The savings achieved in the first two years of operation stood at 55%. The introduction of the TEON heat pump has also made it possible to eliminate approx. 26 tons/year of CO2 emitted to the condominium chimney.
Apartment building
Province
Milan
A TEON model T140 A heat pump has been installed in an apartment building in the city of Novara. The heat pump has a double stage and is optimized to stably produce hot water at temperatures above 70°C with maximum efficiency. In the two cascade circuits, separated by a condenser evaporator, two natural refrigerants (R290 and R600A) are used, each of which operates in its own thermodynamically optimal conditions. The machine is used for the production of heating in the winter season and domestic hot water.
Apartment building
NOVARA
Historic architecture is characterized by low energy inefficiency and high temperature required by their heating systems, with an effect on management costs and the pollution produced. In the context of a prestigious residential complex in the historic center of Turin, two TEON model T250 W machines were installed, serving the heating system of two buildings. The machines are fed with groundwater and produce heating at 70°C serving a system equipped, in part, with cast iron radiators.
Residential complex in the historic center
Turin
Inside a residential complex in Saronno divided into several apartment buildings, and served by a centralized thermal power plant, five TEON models T250 W and T60 W machines were installed, for a total thermal power of 1,060 kW. The heat pumps are fed with groundwater through a well field for extraction and subsequent return and produce hot water between 55° and 75°C to serve the centralized heating and domestic hot water system. The entire condominium has eliminated CO2 emissions on site.
Residential complex
Saronno
In a quiet residential area near the Janiculum in Rome, inside a residential complex comprised of several buildings, two TEON model T250 G heat pumps have been installed to serve the central heating system. The heat pumps are powered by a geothermal source, through a closed cycle system made up of 33 vertical probes installed beneath the condominium tennis court. The intervention led to the elimination of gas boilers, the elimination of emissions on site, introducing high efficiency heat pumps capable of operating with traditional radiators.
Apartment buildings
Roma
Two TEON reversible heat pumps, model RT60 G, have been installed in a residential complex in Milan consisting of two six-storey buildings. The machines are powered by the geothermal source through a field of probes and offer hot water to the heating system during the winter season; in the summer period they continue the instant production of centralized domestic hot water at a temperature of 55°C and cooling at a temperature of 7°C. The operating logic provides for an alternating priority of the machines for the two services. TEON heat pumps replaced two methane gas boilers.
Apartment buildings
Milano
In a large multi-family villa located in the middle of the Turin hills, two Air air-water heat pumps have been installed to replace a pellet heating power plant. The two TEON heat pumps with a thermal power of 30 kW each were used to produce heating in the winter season and domestic hot water throughout the year. The intervention was carried out without modifying the existing system consisting of radiators serving the rooms of the villa.
Multi-family villa
Turin
Six TEON model T 350 W heat pumps were installed in a large condominium in Milan built in the mid-1950s, consisting of 16 buildings (357 residential units). The new thermal power plant replaced four diesel generators with a total thermal power of 2,400 kW for heating and all the independent boilers for the production of domestic hot water. A new electrical substation allowed the power supply to the new power plant, while the natural source was created through three intake wells and four yield wells in the first aquifer. The heat pumps operate up to 80°C with a sliding temperature, based on climatic conditions. Following the intervention, savings of 58% were recorded and by virtue of the new energy class of the buildings (which went from "G" to "C") each apartment saw its market value increase between 6% and 10%.
Residential Complex
Milan
In the splendid historic complex on the Isola del Garda, which has recently become touristic and open to the public, three TEON heat pumps models T60 W and RT30 W have been installed, replacing an oil boiler. The building has large heat losses and the heating system consists of traditional radiators. TEON heat pumps therefore offer hot water at 75°C and add cooling production in the tower. The natural source used by heat pumps is lake water.
Historic residence
Lake Garda
In an apartment building built in the mid-1960s and made up of 6 apartments for a total useful surface area of approximately 540 m2, a heat pump with a thermal power of 82 kW was installed to replace a methane boiler, for the production of heating in the winter season and DHW throughout the year. The intervention was carried out without modifying the existing system, consisting of radiators, and involved the construction of a domestic well for the exchange of heat with groundwater. The introduction of a heat pump made it possible to eliminate approx. 21 tons/year of CO2 emitted to the condominium chimney. This resulted in a recovery of two energy classes of the entire building. Economic benefits: a 39% reduction in running costs of the current boiler was achieved.
Apartment building
Torino
In a large residential complex in San Benigno Canavese in the province of Turin, consisting of 38 real estate units, a TEON model T350 G heat pump was installed to serve the centralized heating and domestic hot water system. The condominium had a thermal power plant consisting of a methane boiler that generated a total power of 426kW for heating production alone, while autonomous boilers were present for DHW. The new heat pump is powered by a geothermal source offered through 27 closed-cycle probes, 130 meters deep. Hot water production reaches 80°C
Residential complex
province of Turin
Non-Residential Applications
Selected projects carried out
In the new TEON factory in Collegno (Turin), a completely renovated complex of industrial architecture dating back to the 1960s, we have installed three RT250 W model reversible machines with a total power of 750 kW, for the production of heating, domestic hot water and summer cooling. The machines offer thermal energy to the production area at a temperature of 80-85°C distributed through thermo-strips, to the healthcare services with radiator terminals and to the office building, equipped with fan coils. The heat pumps are installed in a groundwater geothermal system, which replaced the pre-existing condensing thermal power plant, completely eliminating the carbon footprint of the entire plant.
New TEON plant
Collegno
The intervention consisted of replacing existing oil boilers (3000 kWt) and chillers (1500 kWf) at the thermal power plant of an office complex with 1 x 250 kWt heat pump + 2 x 500 kWt double-stage heat pump, for a total of 1,250 kWt and 1,050 kWf. As part of the project, 2 wells were built for the extraction of first aquifer water and 3 re-injection wells to serve a maximum total flow rate of 180 cubic meters/h. The centralized air/water heating and cooling system, consisting of 2 air handling units plus fan coils and radiators, remained unchanged. TEON heat pumps produce heat and cooling simultaneously for most of the year. The presence of radiators, the large hydraulic circuit and the presence of an intermediate exchanger between production and distribution made it necessary to produce hot water at temperatures not lower than 70 °C, while the chilled water is delivered at 7 °C
Office Complex
Assago
At a hotel in the metropolitan area of Milan, equipped with 50 rooms, with gym and swimming pool as well as a restaurant area, a TEON model T140 A heat pump was installed to serve the centralized heating and domestic hot water system. The air-water machine with a thermal power of approx. 140kW, consists of a double stage in cascade and offers hot water to the entire structure at an average temperature of 70°C, replacing a previously installed condensing boiler.
hotel
MILANO
In a traffic police barracks in the province of Cuneo, two TEON heat pumps models RT115 A and RT115 G were installed. The machines produce hot water at 65°C for the heating system and cold water in the summer season for air conditioning at 7°C. The system was built using the three natural sources for the heat pumps: air, through a dry-cooler, soil, through the creation of vertical geothermal probes and groundwater, collected through a pumping well. The system's operating logic optimizes thermal energy production on a seasonal and annual basis, based on climatic conditions.
Traffic Police
Barracks (Cuneo)
TEON has installed a T250-DC W machine in the district heating network of the city of Turin. The double-stage machine is fed with groundwater drawn through two wells at approx. 11°C and produces hot water for a branch of the TLR primary circuit at 95°C (up to 109°C). This installation represents one of the first steps towards the efficient decarbonisation of systems, such as district heating, typically powered by fossil fuel power plants.
DISTRICT HEATING
TURIN
In the industrial site of a global zipper manufacturer, two 350kW multi-source reversible heat pumps, air and water, were installed through 3 intake and return wells. The intervention made it possible to replace an overall annual consumption of 50,000m3 - 55,000m3 of fuel gas on average, with a consumption of approximately 125,000 kWh of electricity/year, with a reduction in equivalent CO2 emissions of approximately 74%.
Industrial site
province of
Ascoli Piceno
At the production site of a major global tire manufacturer, a customized TEON T1.0MB-DC air-water heat pump was installed, with a nominal heat capacity of 1.000kW, with a double stage configuration comprising R290 on the lower stage and R600A upper stage, to offer winter heating at 70°C to two industrial warehouses and an office building at the Client site. The buildings are hooked to the site’s District Heating, which remains available as backup; when the HP is in operation, the withdrawal of thermal energy of these buildings from the DH network eliminated;
Industrial
warehouses
A double-stage heat pump has been installed at the service center of a major global steel company, with a heating capacity of 115 kW and a cooling capacity of 90 kW for the production of heating, DHW and summer cooling. The heat pump, which powers a distribution system made up of convector heaters and radiators, serves the office building, the workers' and employees' canteen, the changing rooms, the bathrooms and the warehouse, for a total of approx. 600 m2 of heated and cooled volume. 72% of primary energy comes from heat exchange with groundwater: the remaining 28% is made up of electricity, eliminating approximately 53 tonnes/year of CO2.
Office building in industrial site
Turin
At the production site of a leading supplier in the automotive sector, a TEON model RT350MB-DC air-water heat pump was installed, configured in a double stage with R290 and R600A circuits, to offer winter heating and summer cooling to the office building. The machine works with a sliding flow temperature up to 70°C in winter and cooling temperature of 7°C in summer.
Industrial site
province of Alessandria
At the production site of a major global tire manufacturer, a customized TEON T1.8 water-water heat pump was installed, with a nominal heat capacity of 1.800kW, to offer winter heating at 70°C to three industrial buildings at the Client site The heat pump works during the winter season and draws heat from a fume recovery circuit in which the temperature is reduced to 35°C
Industrial
building
In a school complex of over 1,000 students in Pordenone, including four institutes, a double-stage heat pump model T115-DC W was installed to integrate a thermal power plant with dispatch priority, replacing a methane boiler. It offers heating in the winter season (classrooms and gym) and DHW (bathrooms) throughout the year by powering a radiator system. The choice of the TEON heat pump arose from the need to offer high temperatures (80°C), a key element in mixed contexts such as schools, exposed to legionella risk, and from the objective of eliminating students' exposure to the emission of harmful pollutants on site. The result was the elimination of approx. 18 tons/year of CO2 and 50% reduction in operating costs.
School complex
Pordenone
The TEON double-stage heat pump model T250-DC W at the aqueduct managed by a primary utility in northern Italy involves the use of water drawn through a collector from the primary circuit of the aqueduct and a complete return using overpressure pumps at a temperature lower than 3 °C. This is an installation serving two coupled buildings, a workshop and warehouse, whose volume is approximately 4,000 cubic metres. Previously these spaces were heated with a methane boiler. Thermal energy in winter is supplied at temperatures varying between 70°C and 80°C. The indoor terminals consist of fan coils in the office areas and radiators in the changing rooms, bathrooms, showers and common areas and in the warehouse areas.
Aqueduct network
Piedmont
At the production site of a major global tire manufacturer, a customized TEON T1.2 water-water heat pump was installed, with a nominal heat capacity of 1.200kW, to offer winter heating between 65 and 70°C to an industrial warehouse at the Client site The heat pump operates during the winter season and draws heat by tapping it at 20°C from a process cooling circuit directed to the cooling tower and returning it to the same circuit with a delta T of around 4°C. As a result, the operating activity of the cooling tower is reduced
Industrial
warehouse
Installed in the five-storey building of the ICGEB (International Center for Genetic Engineering and Biotechnology), the T115-DC W TEON double-stage heat pump simultaneously produces chilled water and thermal energy. While the chilled water is sold to the distribution system made up of convectors, the thermal energy at 85°C is delivered to a lithium bromide absorber which recovers the thermal waste, producing, in turn, additional free cooling energy with almost zero electricity consumption. The heat pump works in summer using return water, both from the air conditioning distribution systems at 12 °C and from the absorber at 85 °C. Furthermore, the heat pump was put at the service of laboratories, conference rooms, offices, bathrooms, common rooms, warehouse, for a covered area of approximately 5000 m2.
Research center
Trieste
In the historic site), a RT350-DC W TEON double-stage heat pump was installed in combination with a 130 kWe cogenerator. As part of the project, wells for the extraction and return of first aquifer water were built, for a flow rate of 48 m3/h. The new layout of the plant - which replaces the methane-fueled condensing boilers - is designed to supply part of the electrical utilities and to generate heating, cooling and domestic hot water (DHW) for the main building, two restaurants, the gym, wellness centre, changing rooms, swimming pool, tennis courts (one of which is covered). Considering the promiscuity of the environments to be heated, the thermal energy is delivered at 80°C. The cogenerator is electrically controlled by the TEON heat pump, with surplus electricity used to serve other utilities in the Centre, thus reducing withdrawal from the grid.
sports club
Casale Monferrato (AL)
For a sports center in the western barrier of Milan, covering an area of approximately 23,000 square meters and with international excellence in swimming, two TEON model T 350 W heat pumps were installed for a total thermal power of approx. 700 kW. In an energetically complex context due to the presence, among others, of seven indoor swimming pools, cardio and weight room, fitness area, wellness and catering services, a water-water geothermal installation was chosen with an open loop system consisting of three pumping wells and two wells for reintroduction into the aquifer. The machines use a source at a temperature of approx. 13°C and deliver it to the plant at a temperature between 65°C and 75°C.
SPORTS CENTER
MILAN
In a historic rice mill in Tronzano Vercellese, which has been cultivating, packaging and distributing rice all over the world since 1906, with particular attention to respect for the environment, two TEON heat pumps have been installed, with a total thermal power of 60 kW and cooling power of 40 kW for the production of heating, DHW and summer cooling. The heat pump serves the production, the office building, the workers' and employees' canteen, the changing rooms, the bathrooms and the warehouse. The two TEON heat pumps power a mixed system, made up of fan coils, AHUs and radiators in the changing rooms, bathrooms, showers and common areas. Over 75% of primary energy comes from heat exchange with groundwater via a hydrothermal well and a re-injection well; the remaining 25% is made up of electricity. Local climate-changing emissions have therefore been completely eliminated.
Rice mill
province of Vercelli
The Franciscan community of Bethany, a reality made up of 10 Italian and international offices that offer hospitality to traveling faithful, has chosen the TEON solution to redevelop the Partanna office in the province of Trapani with regards to heat generators and air conditioning. A fossil fuel thermal power plant was installed in the headquarters, and there was no type of cooling. An Air heat pump was installed, with a thermal power of 200 kW, capable of providing heat and cold to appropriately air-condition the rooms and ensure the need for domestic hot water. The effects appreciated were lower consumption of the energy carrier (and bill reduction of approximately 42%) and the elimination of emissions on site.
Religious complex
Trapani
In a renovated industrial warehouse divided into an office area, a multimedia room and a storage area, a TEON heat pump model RT60 W has been installed which heats and cools the entire volume via a fan coil system and mechanical ventilation. In addition to the offices, the structure is equipped with a guesthouse with 8 beds and 6 showers used by the company's teams. The structure is therefore used 24x6: during the day by the office staff and from late afternoon until early morning by the teams staying in the guesthouse.
Plant
Paderno Dugnano
(Milan)
In a hypermarket in Buccinasco belonging to an important Italian chain, two customized heat pumps of 250 kWt each have been installed which allow the recovery of the heat waste at 35°C developed by food counters and cold rooms and the production of hot water for heating and DHW at 80°C. This solution allows us to avoid disposing of the heat produced by these refrigerators into the air and to replace the boilers and consequently reduce its CO2 emissions. This solution uses innovative technology that allows you to save on your bill and reduce primary energy and harmful emissions into the atmosphere. This solution can be replicated in all those commercial contexts with similar conditions (e.g. availability of thermal waste and need for hot water to be used for space heating and for the production of domestic hot water (DHW).
Hypermarket
Lombardy
Industrial Applications
Selected projects carried out
A T70DC model Teon double-stage pump was installed at a producer of mozzarella, ricotta and milk derivatives to meet the simultaneous need for hot water for pasteurization (+86°C) and cold water (-2°C). The heat pump replaced a steam boiler of approximately 1.0MWt with production at 120°C at low pressure and a chiller. The excess thermal energy is recovered and sent to the building's winter heating system.
dairy
sector
In the production site of one of the largest Italian cured meat producers, two TEON model T250 W machines have been installed in the ham processing process. Heat pumps provide hot water at 80-82°C used for cooking cooked ham as a replacement for the steam boiler. At the same time, water cooled to around 29 °C is supplied to the refrigeration plant. The simultaneous use of thermal and cooling energy satisfied by TEON heat pumps has increased the energy and economic benefit of the investment made, shortening the payback times.
Meat
sector
A TEON model RT115 W heat pump has been installed in the production site of a distributor of food and frozen products in the province of Alessandria. The machine recovers the heat produced by a cold storage system for frozen food products by providing hot water between 30 and 80°C for heating the offices and warehouses of the plant during the winter season, with return of cold water at 18°C to the condensers of the storage system.
Food
sector
At the site of a laminate mold manufacturer, two high-temperature TEON heat pumps model T350 W were installed to heat to approx. 60°C the galvanic baths and keep them at temperature, also providing them with cooling during the electrolytic cycles, and to heat the exchange air (approx. 40,000 m3/h) of the AHUs necessary to purify the rooms that house them from the miasma of mercury vapour.
Manufacturing
sector
A double-stage TEON model T350MB-DC machine is installed in the production plant of a metalworking company, which carries out chrome plating on various products for the mechanical and automotive industry. The heat pump is used to maintain the temperature in the chrome plating tanks of the galvanic bath at around 71°C throughout the year and to simultaneously produce hot water at 60°C for heating the production areas and offices in the winter season. Thanks to the coverage of electricity needs provided by a photovoltaic and a hydroelectric system, energy costs have been essentially eliminated, as have polluting emissions into the atmosphere
Mechanical
sector
Two TEON model T250 W machines have been installed in the industrial site of an auto component manufacturer in Piedmont. The heat pumps supply cooled water (between 10°C and 30°C) to a compressed air unit and, at the same time, hot water (at temperatures raised up to 86°C) delivered to the plant's hot water distribution ring. The simultaneous production of cooling energy and thermal energy occurs 24 hours a day throughout the year, thus maximizing the use of the heat pump and the savings generated.
automotive
sector
At the production site of a supplier of plastic fabrics for car covers in the province of Lodi, a TEON model RT250 heat pump was installed, customized to alternatively use two natural sources (dual source): air and water. The heat pump produces hot water (at 65°C) for heating and DHW by recovering process waste during the winter period. Throughout the year the same machine produces cooled water (at 18°C) to serve the plastic tarpaulin molding department.
PLASTIC
sector
A TEON model T 350 G heat pump powered by 30 geothermal probes has been installed at a primary livestock farm located in Soncino in the province of Cremona, serving a new biomethane production plant with a capacity of 250 smc/h connected to the local network of the municipality of Soncino. The biomethane production plant, whose digester is kept at temperature by the heat pump throughout the year (replacing a cogenerator), is built on an area of approximately 19,000 m2, powered by livestock waste and produces approximately 2,000,000 smc of biofuel per year.
Biodigester